Metal Shopping Mall Building For Shopping
  • Metal Shopping Mall Building For Shopping
  • Metal Shopping Mall Building For Shopping
  • Metal Shopping Mall Building For Shopping

Metal Shopping Mall Building For Shopping

Brand SYLY

Product origin China

Delivery time 30working days

Supply capacity 5000tons/month

1. Steel structure metal shopping mall building roofs can stay cooler is due to the addition of chemicals designed to reflect infrared wavelengths, which can be added to the metal building paint. this also makes the buildings more beautiful.
2. Steel metal building for shopping are easily customizable in their appearance, and can be designed to fit a certain local or a specific company brand. From eaves to massive garage doors to skylights. It is easy to adjust the dimension and appearance.
3. This steel structure building's product can be installed in any weather. The building has the advantage of being fire-proof, heat/cold-insulation, non-shrinking and enlarges the work size, and has little pollution.

Metal Shopping Mall Building For Shopping

Quick Details

Type

Metal Shopping Mall Building For Shopping

Warranty

3 years

Afrer-sale Service

Online technical support

Onsite Installation

Onsite Training

Onsite Inspection

Free spare parts,

Teturn and Replacement

Project Solution Capability:

graphic design

3D model design

Total solution for projects

Cross Categories Consolidation 

Standard

GB standard

Design Style

Transitional

Place of Origin

Liaoning, China

Brand Name

SYLY

Certificate

ISP9001:2008

Purlin

C shape purlin

Wind loading

200km/h

Life time

50 years

Surface treatment

Anti-rust painting or galvanized

Door

Rolling door or sandwich panel door

Roof and wall

Single layer sheet or sandwich panel

Window

PVC or aluminium window

metal shopping mall building   

Products Description


Items

Specification

Main structure

PEB welded H-shaped steel or hot rolled steel, Q355 or Q235

Anti-rust protection

Hot dip galvanized or anti-rust painting

Purlin and girts

Cold rolled C or Z steel, Q355 or Q235

Roof and wall

Single layer steel sheet or sandwich panel

Gutter

Heavyduty galvanized steel

Downpipe

PVC

Door

Sliding door or roller shutter

Windows

PVC or aluminum alloy

Other components available upon request. Please provide the following information for detailed custom design.


metal building for shopping

The advantage of prefab steel shopping mall

(Used in our  China Manufacturers Prefab Supermarket Building Material Price)

1. The tensile strength of steel is much times greater than concrete.


2. Steel is also ductile in nature.


3. Steel has also a high strength to weight ratio as compared to concrete.


4. Steel structures are also preferred when the time span is small. The construction rate is very fast.


5. Steel bars are also reusable. 


6. Steel structures can be extended in any direction.


7. Steel has smaller columns as compared to concrete columns, so due to this more space will be available for some other functions.


8. As steel structures are lighter than concrete, therefore there is less cost used and the foundation of the structure becomes less expensive.


9. Steel structures are cost-effective

steel building


The prefab metal shopping mall buildings are extremely easy to assemble. Each piece is clearly marked for easy identification.  The whole building erects step-by-step in a logical manner, with high-strength bolts and self-drilling screws.  It is much like a giant erector set.


1. Steel structure metal shopping mall building roofs can stay cooler is due to the addition of chemicals designed to reflect infrared wavelengths, which can be added to the metal building paint. this also makes the buildings more beautiful.


2. Steel metal building for shopping are easily customizable in their appearance, and can be designed to fit a certain local or a specific company brand. From eaves to massive garage doors to skylights. It is easy to adjust the dimension and appearance. 


3. This steel structure building's product can be installed in any weather. The building has the advantage of being fire-proof, heat/cold-insulation, non-shrinking and enlarges the work size, and has little pollution.


metal shopping mall building

Quote information

Could you tell me your requirement for your steel structure project?

Basic design requirements and design Load,

1.     Project site location:

2.     Overall dimension (length*width*eave height in meters):

3.     Mezzanine of not? How many kgs of load per square meter on mezzanine?

4.     Single-layer steel sheet wall or sandwich panel wall:

5.     Snow load if applicable:

6.     Wind speed/load:

7.     Interior column allowed or not:

8.     Overhead crane needed or not, capacity:

9.     Any other particular requirements:


metal building for shopping

Certifications

steel building

Company Profile

metal shopping mall building

Our group headquarters is located in Shenyang. Our manufacturing facilities are located in Liaoning, Shandong, Hebei, and Heilongjiang. We have the best quality of manufacturing equipment and a group of outstanding technical personnel. We have accumulated a wealth of practical experience in steel structure fabrication and installation and passed ISO9001:2000 quality management system certification.


With the purpose of “Market is the lead, Quality is the center, Treat the client with friendly service”, our company has become a modern enterprise integrating with manufacture and construction as a whole. Our company offers the whole set of services of all kinds of light steel buildings including design, manufacture, and construction. Our company emphasizes contract complying with credibility with rigorous product manufacturing processes.

metal building for shopping

Packing Logistics


Fixed packing, loading, transportation, unloading the matters needing attention:

(1) The lifting large there must be a person responsible for the use of fixture, suitable, strictly abide by the rules of lifting, to prevent the occurrence of vibration, impact, deformation or damage, fall in the hoisting process.

(2) At the time of loading, there must be a special supervision, check car number and packing, the car pile up securely, and to increase the necessary binding component loosening, prevent the loss.

(3) Remained stable in the transport process, the vehicle at the time of shipment, on the long, wide, high object transport, must be trained pilots, escort personnel responsible for, and mark is arranged on a vehicle.

(4) No rough handling, loading and unloading personnel handling, weight, size should be familiar with the components, and check the horse sling, rigging, prevent accidents.

(5) The member to the construction site, timely organization of unloading, stacking area.

(6) The crawler crane carrying member, should pay attention to the surrounding terrain, air condition, prevent the crawler crane overturning and component collision.


steel building

Project Cases

metal shopping mall building

Steel structure building project in the USA

metal building for shopping

Steel structure building project in Georgia

steel building

Steel structure building project in the Democratic Republic of the Congo

metal shopping mall building

Steel structure building project in Mozambique

metal building for shopping

Steel structure building project in Togo


Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy

close left right