Steel structure Air Hangar Barn Prefab
  • Steel structure Air Hangar Barn Prefab
  • Steel structure Air Hangar Barn Prefab
  • Steel structure Air Hangar Barn Prefab
  • Steel structure Air Hangar Barn Prefab

Steel structure Air Hangar Barn Prefab

Brand SYLY

Product origin China

Delivery time 30working days

Supply capacity 5000tons/month

Steel structure Air Hangar Barn Prefab
1. Steel structure building is fast and flexible to assemble, safe, thermal and noise insulation, waterproof, fire prevention, and cost-effective, Fast and easy installation greatly shortens the construction time which reduces the costs.
2. The whole steel structure is easy to maintain and can be used for more than 70 years. The perfect design completely avoids leaks and water seepage. Meanwhile, it's also in line with the national level of fire prevention.
3. Steel buildings can be constructed without any interior columns that might take up valuable floor space or interfere with interior operations. The simple fact that machines and laborers do not have to maneuver around massive interior columns can save countless hours of work. It also is incredibly important in maximizing space for storage.

Steel structure Air Hangar Barn Prefab

Quick Details

Type

Steel structure Air Hangar Barn Prefab

Warranty

3 years

Afrer-sale Service

Online technical support

Onsite Installation

Onsite Training

Onsite Inspection

Free spare parts,

Teturn and Replacement

Project Solution Capability:

graphic design

3D model design

Total solution for projects

Cross Categories Consolidation 

Standard

GB standard

Design Style

Transitional

Place of Origin

Liaoning, China

Brand Name

SYLY

Certificate

ISP9001:2008

Purlin

C shape purlin

Wind loading

200km/h

Life time

50 years

Surface treatment

Anti-rust painting or galvanized

Door

Rolling door or sandwich panel door

Roof and wall

Single layer sheet or sandwich panel

Window

PVC or aluminium window

air hangar

Products Description

Items

Specification

Main structure

PEB welded H-shaped steel or hot rolled steel, Q355 or Q235

Anti-rust protection

Hot dip galvanized or anti-rust painting

Purlin and girts

Cold rolled C or Z steel, Q355 or Q235

Roof and wall

Single layer steel sheet or sandwich panel

Gutter

Heavyduty galvanized steel

Downpipe

PVC

Door

Sliding door or roller shutter

Windows

PVC or aluminum alloy

Other components available upon request. Please provide the following information for detailed custom design.

hangar barn

Steel aircraft hangars

Metal building kits for custom aircraft hanger for sale with hangar accessories, windows, and bi-fold doors.

The rigid frame straight wall metal building kit is among the most widely used building for airplane hangars. The building is certified for hurricane force winds and heavy snow loads and is virtually maintenance free. The steel structure is sealed tight and mostly impervious to rodents and pests that could get into your engines. With insulated roof and wall cladding along with the proper ventilation your aircraft hangar will have the perfect environment for storing your airplanes or other aircraft.

Steel structure Air Hangar Barn Prefab

1. Steel structure building is fast and flexible to assemble, safe, thermal and noise insulation, waterproof, fire prevention, and cost-effective, Fast and easy installation greatly shortens the construction time which reduces the costs.

2. The whole steel structure is easy to maintain and can be used for more than 70 years. The perfect design completely avoids leaks and water seepage. Meanwhile, it's also in line with the national level of fire prevention.

3. Steel buildings can be constructed without any interior columns that might take up valuable floor space or interfere with interior operations. The simple fact that machines and laborers do not have to maneuver around massive interior columns can save countless hours of work. It also is incredibly important in maximizing space for storage.




hangar prefab

air hangar

Quote information

Could you tell me your requirement for your steel structure project?

Basic design requirements and design Load,

1.     Project site location:

2.     Overall dimension (length*width*eave height in meters):

3.     Mezzanine of not? How many kgs of load per square meter on mezzanine?

4.     Single-layer steel sheet wall or sandwich panel wall:

5.     Snow load if applicable:

6.     Wind speed/load:

7.     Interior column allowed or not:

8.     Overhead crane needed or not, capacity:

9.     Any other particular requirements:

hangar barn

Certifications

hangar prefab

Company Profile

air hangar

Our group headquarters is located in Shenyang. Our manufacturing facilities are located in Liaoning, Shandong, Hebei, and Heilongjiang. We have the best quality of manufacturing equipment and a group of outstanding technical personnel. We have accumulated a wealth of practical experience in steel structure fabrication and installation and passed ISO9001:2000 quality management system certification.

With the purpose of “Market is the lead, Quality is the center, Treat the client with friendly service”, our company has become a modern enterprise integrating with manufacture and construction as a whole. Our company offers the whole set of services of all kinds of light steel buildings including design, manufacture, and construction. Our company emphasizes contract complying with credibility with rigorous product manufacturing processes.

hangar barn

Packing Logistics


Fixed packing, loading, transportation, unloading the matters needing attention:

(1) The lifting large there must be a person responsible for the use of fixture, suitable, strictly abide by the rules of lifting, to prevent the occurrence of vibration, impact, deformation or damage, fall in the hoisting process.

(2) At the time of loading, there must be a special supervision, check car number and packing, the car pile up securely, and to increase the necessary binding component loosening, prevent the loss.

(3) Remained stable in the transport process, the vehicle at the time of shipment, on the long, wide, high object transport, must be trained pilots, escort personnel responsible for, and mark is arranged on a vehicle.

(4) No rough handling, loading and unloading personnel handling, weight, size should be familiar with the components, and check the horse sling, rigging, prevent accidents.

(5) The member to the construction site, timely organization of unloading, stacking area.

(6) The crawler crane carrying member, should pay attention to the surrounding terrain, air condition, prevent the crawler crane overturning and component collision.


Project Cases

hangar prefab

air hangar

Steel structure building project in the USA

hangar barn

Steel structure building project in the Georgia

hangar prefab

Steel structure building project in the Democratic Republic of the Congo

air hangar

Steel structure building project in the Mozambique

hangar barn

Steel structure building project in the Togo


Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy

close left right